A TO Z BUSINESS SOLUTIONS Mega Projects Starts From Ground Zero Strategic Partners in Construction, Energy WE WOULD ALWAYS FIND THE MISSING PART GLOBAL INVESTMENT SOLUTIONS GLOBAL NETWORK

Feasibility Study References

Feability Studies
  • 5 Star hotel in Jumaira palm
  • Invert Sugar Syrup
  • Aluminum Fluoride
  • Burnt Lime
  • Ethanolamine
  • Ethyl Acetate
  • Placental Resins
  • Soda Ash & Ammonium
  • Animal Gelatin Powder.
  • Improvers for Bakery
  • Activated Carbon Project
  • Additives for Lubricants.
  • Epoxy & Acrylic Flooring.
  • Formulated Pharmaceutical "OTC".
  • Gasoline Octane Improvers.
  • Sodium Met oxide Project.
  • Synthetic Ethanol Project.
  • Inflatable Safe Play.
  • Extraction of Palm Oil Liquid & Solid Fraction Project
  • Spiraling Algae Powder
  • Equipment Machinery Specification (Cement)
  • Summary Feasibility Study Cement Factory
  • CO2 Gas Shielded Arc Welding
  • Non-Woven Fabric Hot Melting Style
  • Animal Feed Making Plant
  • Ready Mixed Concrete Plant
  • Self-Adhesive Tape
  • Bean Sprout Cultivating Plant
  • High Fructose Syrup Plant
  • Ice Cream Making Plant
  • Mineral Water Making Plant
  • Fancy Wood Making Plant
  • Caustic Soda
  • Light & Activated Calcium Carbonate Making Plant
  • Quicklime & Hydrated Lime Making Plant
  • Sodium Silicate Water Glass
  • Foundry Plant
  • Non-Woven Fabric Double
  • Pharmaceutical Products Processing Plant
  • PVC Film
  • PVC Pipe
  • Wood pallets plant
  • Glass tempering plant
  • Aluminum for windows/doors plant
  • Rubber plant
  • Toothbrush
  • Transformer Oil
  • Universal Slotted Steel
  • Hard-shell Gelatin Capsule
  • Polyimide Granules
  • Rayon Continuous Filament Plant
  • Financial Analysis (Cement)
  • Main-Pharma Pharmaceutical factory


References